Jagga ValuationGlossary · guide.jaggavaluation.com
Glossary
Nepali land and valuation vocabulary, plus the platform’s own words. One line each. Terms are grouped in the order you will meet them; use the letters or Ctrl F to jump.
Land and land records
- access class
- The certified road-access classification taken from the sifaris. It is the access fact that moves money — and it is deliberately kept separate from whatever road access the client declared.
- charkilla
- The four-boundary description of a plot — what lies north, south, east and west of it.
- gazette
- The government’s published notice of land rates. The source a rate book is built from.
- Ghar-Bato Sifaris
- The ward office’s letter certifying what road a property has access to. This is what the government land rate is keyed to, which is why the surveyor captures its booklet number, classification code and issue date on site.
- haal
- The present address, after restructuring. Recorded alongside the saabik address.
- khahare khola
- A seasonal stream. Another thing a plot can adjoin.
- kitta
- A cadastral plot — one registered parcel of land. It is the thing a valuation is about.
- lalpurja
- The land-ownership certificate. The main proof of who owns a plot, and one of the recorded sources for its area.
- land rate book
- The rate schedule derived from the government gazette, per Land Revenue Office and per Nepali fiscal year. It moves through draft, then verified, then published — and only a published book lets a report be issued.
- malpot office
- The Land Revenue Office. Its jurisdiction publishes the land rate book a parcel is valued against.
- moth
- A cadastral register identifier, recorded with the plot and sheet numbers.
- parti
- Unregistered or waste land. Another possible neighbour of a plot.
- rajkulo
- A traditional irrigation channel. One of the things a plot can adjoin, and it can change the rate classification.
- saabik VDC
- The former Village Development Committee an address belonged to before the 2074 restructuring. The government land rate is keyed to this, not to the current ward.
- sheet no / plot no
- A cadastral map sheet number, recorded on the parcel alongside the plot number.
- sifaris
- A recommendation letter from a government office. In valuation it nearly always means the Ghar-Bato Sifaris.
- trace map
- The cadastral tracing of a plot. One of up to four recorded sources for the area, and it can disagree with the lalpurja.
Land area units
- aana
- Hill-system area unit. A sixteenth of a ropani — about 342 square feet, or roughly 31.8 square metres. Divided into 4 area-paisa.
- adopted area
- Of the recorded areas — lalpurja, trace map, field measurement — the one the valuer adopts. Only the adopted area drives the value. Departing from the largest source by more than the tolerance needs a recorded reason.
- bigha
- Terai area unit. 20 kattha, about 72,900 square feet.
- dam
- The smallest hill-system area unit — a quarter of an area-paisa.
- dhur
- Terai area unit. A twentieth of a kattha, roughly 17 square metres.
- Heron's formula
- The way an irregular plot’s area is worked out: split it into triangles and compute each from its three side lengths. Sides that cannot form a triangle are refused rather than producing a wrong area.
- kattha
- Terai area unit. A twentieth of a bigha — roughly 339 square metres. Divided into 20 dhur.
- paisa (area)
- Hill-system area unit. A quarter of an aana, divided into 4 dam. Not the same thing as money paisa.
- rate basis unit
- The regional unit a valuation is actually carried out in — aana in the hills and mountains, kattha in the Terai. Every rate input converts into it, so a Terai file is priced and printed in the unit its gazette and its client actually use.
- ropani
- Hill-system area unit. 16 aana, about 5,476 square feet.
How a valuation is calculated
- cost approach
- Valuing a building by what it would cost, producing three figures: projected, present and remaining.
- depreciation
- How much a building has lost to age, from a firm-wide table of construction type against age band. Some cells are a rate per year, applied smoothly so value does not jump at a band boundary; others are a stepped total percentage, which is what some banks require. A minimum residual floor — 10% by default — stops depreciation consuming a building entirely.
- distress value
- A forced-sale figure, lower than market value, reported alongside it. Some banks want it on the land only.
- government rate
- The rate from the Land Revenue Office’s rate book. Where it comes from a sifaris classification it is authoritative; where it is derived from attributes it is only indicative.
- market rate
- The prevailing rate, from the consultancy’s own overlay. If none has been asserted, the government figure stands in as a labelled fallback — which blocks the report from being issued.
- plinth area
- The built footprint area of a building, used as the basis for building valuation.
- present value
- What the completed portion is worth at the date of the site visit. This is the only one of the three that feeds a total.
- projected value
- What the building would be worth completed.
- remaining value
- The balance still to be completed.
- schedule rate method
- Valuing a building at a prescribed schedule rate.
- weighted land value
- The land figure produced by combining the government and market rates at a set weighting.
Money
- commission
- The firm’s and the platform’s shares of a fee. Separately permissioned from case prices — a Case Manager sees a price but never commission.
- credit note
- A recorded reversal, numbered in its own yearly series. Refunds reverse; they never erase.
- field visit fee
- The standalone charge for the site visit, around NPR 1,000 for a valuation. Never counted towards the report fee.
- milestone
- A portion of the fee that is due at a point in the process. The default is 70% advance and 30% on completion.
- paisa (money)
- A hundredth of a rupee. Every amount in the platform is stored as a whole number of these, never as a decimal. Not the same thing as the area unit of the same name.
- payment gateway
- The online payment services in this phase: eSewa, Khalti, FonePay and Connect IPS. Manual recording is always available too.
- settled
- A milestone is settled once what is recorded against it adds up to its amount — which can include cash, transfers, online payments, tax withheld and a small write-off.
- TDS
- Tax deducted at source. Can count towards settling a milestone, up to the firm’s share.
Dates and codes
- Bikram Sambat
- Nepal’s official calendar. Every date in the platform is shown in it alongside the Gregorian date, each labelled.
- Bikram Sambat fiscal year
- The Nepali fiscal year, starting 1 Shrawan. The yearly invoice and report code series restart on it.
- civil date
- A date used to decide something, worked out in Nepal time (UTC+5:45, no daylight saving). A late-evening action can belong to the next Nepali day.
- display code
- A readable identifier beside the internal one —
CASE-000123,INV-2082-0041. Never reused, even if a file is cancelled. - dual date
- The convention of showing both calendars, each labelled, derived from one stored moment — so they can never disagree.
- NEC
- The Nepal Engineering Council. An engineer’s NEC registration is what makes their signature on a report valid.
- RBBL Valuation Procedure 2077
- Rastriya Banijya Bank’s valuation procedure of 2077 — the built-in reference report format that other formats are cloned from.
The platform
- audit log
- The permanent record of every consequential action. Entries are never edited or deleted; redacting personal data adds a new event rather than erasing an old one.
- case party
- Somebody on a file who does not have an account — a joint borrower, or the local contact who attends the visit.
- consultancy
- One office inside a firm. A second wall within the firm — not a separate system, but staff in one office do not see another’s files.
- idempotency
- The property that repeating an action does not repeat its effect. It is why a retried payment is never recorded twice.
- offline outbox
- The queue on a surveyor’s phone. Captures are written locally first and upload when a connection returns.
- price floor
- The lowest price a Case Manager may quote without an administrator’s approval. 20% below the firm’s price by default.
- price mode
- Either quoted — negotiable down to a floor, with approval needed below it — or fixed, issued at the configured price with no negotiation.
- report format
- The layout, fixed text, computed tables and signature blocks of a report. Usually one per bank.
- review window
- The period after delivery in which a correction can be requested. After it closes, a change needs a new request.
- service
- What a client buys. It bundles required documents, the questions asked, a price mode, the steps a file walks, and the report formats it can produce.
- step library
- The reusable workflow steps — field survey, technical review, authorisation — each authored once with the role that owns it, and reused across services.
- tenant
- One consultancy business on the platform, under its own branding. The outermost wall: no data crosses between firms.
- verification page
- The public page that confirms an issued report is genuine and current. No account needed.
- whitelabel
- Each firm appearing under its own name, logo and colours.
Two things that live elsewhere
- Roles — who does what, and who may see money: Who does what.
- File statuses — what each status on a file means: File statuses.
They are not repeated here, because two copies of the same table drift apart.
Last reviewed 2026-09-08.